Old Unichema Site, Bromborough, UK

SBS Ayrshire purchased around 80 used stainless steel storage tanks of various size, ranging from 10,000 litres to 600,000 litres from the old Unichema Site in Bromborough, UK. This project has been ongoing since 2017 when we shipped 2 x 250,000 litre and 8 x 68,000 litre tanks to Norway. SBS carried out the complete project, including charter of the ship.  Our team…



By
Elaine Burns
0
comment

Removal of filling/packaging equipment

We have an ongoing relationship withDiageo, our most recent project in 2019, was the removal of two bottle filling lines from their Shieldhall site. These projects can be challenging for our personnel due to the fact the site is operational and health and safety is critical. We also purchased and removed a complete returnable glass filing line from AG BARR,Glasgow.  This was then…



By
Elaine Burns
0
comment

St. James’ Gate Factory, Dublin, Ireland

9 x 200,000 litre stainless steel fermentation vessels were purchased by SBS Ayrshire in 2018 from St James’ Gate Brewery in Dublin.  We chartered a ship for these to be sent to another one of our clients in Norway.



By
Elaine Burns
0
comment

Refresco Juice Factory, Dachwig, Germany

In 2018, 30 x 95,700 litre tanks were purchased by SBS from a juice plant in Dachwig, Germany.  We resold these tanks and they were shipped to various location in Europe including; Scotland, England, Ireland, Norway, Denmark, and Belgium. 



By
Elaine Burns
0
comment

Tullibardine Distillery, Auchterarder, UK

In 2016, SBS Ayrshire supplied and installed 6 x 32,000 litre brand new spirit holding vessels.  These tanks were delivered to site, where our personnel had a one-day window to install all 6 tanks.  We fabricated vessel carriers to carefully manoeuvre the tanks in through a low level building and then finally upright and position, where they now sit uniform in a…



By
Elaine Burns
0
comment

Industrial Chemicals, London, UK

Industrial Chemicals contracted SBS Ayrshire to dismantle a redundant chemical plant.  This was challenging due to surrounding environment on a top tier COMAH site.  Every part of the plant was required to be cut into small manageable pieces and lowered to the ground as anything falling from the plant could have had catastrophic consequences.  This project lasted around 4 months.



By
Elaine Burns
0
comment

Waterford Brewery, Ireland

We purchased 6 x 60,000 litre fermentation vessels from Waterford Brewery, Ireland. These were removed by our personnel and shipped from Waterford Port to one of our clients in Norway.



By
Elaine Burns
0
comment

Chemring Energetics, Ayrshire, UK

SBS worked on the Chemring Energetics site in Ayrshire, UK for around 5 years, between 2012 and 2017. During this time we dismantled redundant chemical plants, including a Nitric Acid Concentration and Recovery Plant, which was resold and relocated to our client in India.  This was a complete turnkey project involving the dismantling, match marking, packaging and shipping.  Our client was delighted with…