UNUSED 2021 SIEMENS SST-300 22 MW STEAM TURBINE PACKAGE

UNUSED 2021 SIEMENS SST-300 22 MW STEAM TURBINE PACKAGE
Location:United Kingdom
Description
SBS have available, a 2021 Siemens Energy SST-300 steam turbine package offering approximately 20–22 MW of electrical output. Originally manufactured for a large industrial power project that was subsequently cancelled, this complete OEM package has never been commissioned, operated, or installed and has remained professionally stored in its original factory packaging since delivery.#
Unlike new build power generation equipment that can require lead times of 18–36 months, this Siemens steam turbine package is immediately available in the UK, making it an exceptional opportunity for EPC contractors, independent power producers, utilities, industrial facilities, and energy developers seeking rapid project deployment.
Siemens SST-300 Steam Turbine Specifications
- Manufacturer: Siemens Energy
- Model: SST-300
- Output: Approximately 20–22 MW
- Frequency: 50 Hz
- Year of Manufacture: 2021
- Condition: Unused / Never Commissioned
- Installation Status: Never Installed
- Location: United Kingdom
- Availability: Immediate
Equipment Included
This sale includes a substantial portion of the complete turbine island and associated balance of plant equipment, including:
- Siemens Energy SST-300 steam turbine generator package
- Acoustic enclosure
- Turbine base skid
- Steam system pressure vessels
- Flowserve steam flow control equipment
- Howden SO₂ blower package
- Auxiliary motors
- Mechanical skids
- Factory sealed crates containing plant components
- Spare parts and accessories
- Original OEM documentation (available to qualified buyers)
- Packing lists available upon request
Applications
The Siemens SST-300 platform is widely used throughout industry for:
- Combined Heat & Power (CHP)
- Biomass Power Plants
- Waste-to-Energy Facilities
- Industrial Cogeneration
- District Heating
- Refinery Steam Power
- Petrochemical Plants
- Chemical Processing
- Pulp & Paper Mills
- Food Processing
- Industrial Steam Recovery Systems
- Independent Power Generation
OEM Recommissioning
Because this turbine has never been installed or operated, buyers may choose to engage Siemens Energy directly to inspect, certify and recommission the equipment before installation.
Any recommissioning services would be arranged directly between the purchaser and Siemens Energy at the purchaser's expense.
If you require further information and pricing please get in touch and a member of our team woudl be happy to assist.
Specifications
| Condition | Used |
| Stock Number | SBS20220491 |







